Conveners
Session 5: Code Benchmarking & Intercomparison / Induced Radioactivity & Decommissioning
- Mikhail Kostin (Thomas Jefferson Laboratory)
-
Dr Nam-Suk Jung (Pohang Accelerator Laboratory / POSTECH)22/09/2022, 08:005. Code benchmarking and intercomparisonOral
In our previous work [1], samples of low carbon steel, stainless steel, aluminum and copper were irradiated in the stray radiation field results from the 9.6 GeV electron beam hitting a thick copper target at the PAL-XFEL main beam dump bunker. The induced activity concentration in the samples were measured using gamma-ray spectroscopy and were compared with the old version of FLUKA, 2011.2x....
Go to contribution page -
Robert FROESCHL (CERN)22/09/2022, 08:205. Code benchmarking and intercomparisonOral
The CERN High Energy AcceleRator Mixed Field (CHARM) Facility is situated in the CERN Proton Synchrotron (PS) East Experimental Area. The facility receives a pulsed proton beam from the CERN PS with a beam momentum of 24 GeV/c with 5e11 protons per pulse with a pulse length of 350 ms and with a maximum average beam intensity of 6.7e10 protons per second. The extracted proton beam impacts on a...
Go to contribution page -
Tommaso Lorenzon (CERN)22/09/2022, 08:405. Code benchmarking and intercomparisonOral
The Large Hadron Collider (LHC) at CERN is currently in the early stages of Run 3, i.e. the third operational period of its lifecycle during which the machine will provide particle collisions to the four experiments located along the accelerating ring. Starting from the end of 2025, a three-year Long Shutdown (LS) period, denoted as LS3, will follow. The upgrade work foreseen during this stop...
Go to contribution page -
Dr Reuven Rachamin (Helmholtz-Zentrum Dresden-Rossendorf)22/09/2022, 09:005. Code benchmarking and intercomparisonOral
By the end of this year, all German nuclear power plants (NPPs) will have been shut down. The final shutdown is followed by a post-operational phase in which measures can be carried out to prepare for the NPPs dismantling and decommissioning. One of the important tasks in preparation for the dismantling is to acquire precise knowledge of the specific activities of the reactor pressure vessel...
Go to contribution page -
Steven Lilley (STFC)22/09/2022, 09:205. Code benchmarking and intercomparisonOral
ISIS neutron and muon source, STFC, Rutherford Appleton laboratory Didcot, UK
The ISIS spallation and muon facility uses a proton beam accelerated to 800 MeV in a linac and synchrotron to generate neutrons and, via an intermediate carbon target, muons. The muon intermediate target is located on the extracted proton beam before the neutron spallation target on ISIS target station one. After...
Go to contribution page -
Alice Formento (CERN)22/09/2022, 09:403. Induced radioactivity and decommissioningOral
ISOLDE is a CERN facility dedicated to the production of radioactive ion beams for applications in atomic physics, nuclear astrophysics, fundamental interactions and life sciences. The 1.4 GeV proton beam from the Proton Synchrotron Booster, with a maximum current of 2 $\mu$A, impinges on a thick target kept at high temperature during irradiation. The generated radionuclides diffuse out of the...
Go to contribution page